Weekly Project Update

Griffith and Paseo

Placeholder

Ian Doyle

THIS WEEK'S ACCOMPLISHMENT

    Finished Demolition of Concrete Block Wall on East Side
    Finished Demolition of Dumpster Enclosures on West Side
    Finished Cutting Topping Slab for South Porch Area
    Continued Laying Out / Installing Ductwork Level 1
    Continued Laying Out / Installing Conduit Level 1 & 2
    Started Demolition of Concrete Block Wall South Side
Excavation 1.jpg

Cutting of Topping Slab in South Porch Area Completed

NEXT WEEK'S ACTIVITIES

    Finish Demolition of Concrete Block Wall South Side
    Finish Cutting Elevator Floor Openings Level 1 and 2
    Finish Laying Out / Installing Ductwork Level 1
    Continue Laying Out / Installing Conduit Level 1 & 2
    Start Laying Out / Installing Ductwork Level 2
Excavation 1.jpg

Demolition of Concrete Block Wall Completed on East Side

Excavation 1.jpg

Demolition of Concrete Block Wall Completed on West Side

LOOK AHEAD SCHEDULE

Click on document icon below to review the detailed Look Ahead Schedule.