THIS WEEK'S ACCOMPLISHMENT

    Guardrails/Handrails Installed South Elevation Main Entrance
    Dome Completion/Cleaning To Follow
    East Elevation Stone Production Begins
    Fire Alarm System Work Resumes
    Red River Restoration Working On Dutchman Repairs North Sanctuary Windows
Excavation 1.jpg

Flashing Closure Metal On Dome

NEXT WEEK'S ACTIVITIES

    Stone Production Continues
    Stained Glass Sanctuary Window Restoration In Process; Two Windows Scheduled For 10/10/2024 Installation
    Presidio Metalworks Continues On Guardrails/Handrails West Elevation Lower Level
    Red River Restoration Fabricating Trim For Sanctuary Windows
    Fire Alarm Installation Completion
Excavation 1.jpg
    Ash Masonry Explore Anchor Bolt Sectional Loss In Stones

New Guardrails/Handrails South Elevation Main Entrance