WORSHIP

Braun and Butler completed its first church project in 1990. Since that time we have worked with numerous churches to identify their facilities needs and determine the most cost effective way to meet those needs. Every church project has budget challenges requiring the Braun and Butler team to work with each building committee and the design team to identify every possible way to deliver the desired project within the available budget. Our focus in this effort is to meet the budget without sacrificing the desired level of quality and artistic design. Our success on these projects is a result of our commitment and ability to delivering the best value to the owner.

Some of our related projects include:

University Methodist Church
Lakeway Church Education Building
Lakeway Church Youth Center
Bee Creek Methodist Conference Center
Hope Presbyterian (Education Building)
Immanuel Lutheran Day School
St. James Missionary Baptist Church
St. Johns Episcopal Church